Building the Enhanced Hot Water Drill (EHWD)
Locating end frames
Item Information
- Date: 04/23/2002
- Full Size: 1280x960 (4.27" by 3.20" at 300dpi)
- File Format: image/jpeg
- Description:
One of the first major accomplishments in the development of the EHWD was the construction of the hose reel. It was assembled in Wisconsin and the components shipped to the South Pole in the 2004 Austral season (Nov-Feb).
bill_bart_locating_end_frame
