IceCube
IceCube Neutrino Observatory

Building the Enhanced Hot Water Drill (EHWD)

Aligning end frames on skis

Item Information

  • Date: 05/01/2002
  • Full Size: 1280x960 (4.27" by 3.20" at 300dpi)
  • File Format: image/jpeg
  • Description:
    The large equipment used at the South Pole is moved by dragging. With each sucessive hole to be drilled, the equipment must be moved. Skis are attached for this purpose.

    ron___bart_aligning_end_frames_on_skis2

Category:
IceCube Gallery Building the Enhanced Hot Water Drill (EHWD)

Welding the Hose ReelLocating end framesAligning end frames on skisSled and drumMoving drum
Assembling the reelAssembling the hose reelAssembling the hose reelDrum on its way outOutfitting the MDSs
The Main Heating PlantAdding heatersGenerator heading outSkis for the South PoleEHWD Electronics
Working on the EHWDEHWDThe drill headAttaching calipersThe drill head system
The drill head systemThe drill headMDS leaving for South PoleMDS leavingTower Operation Workshop on its way
The drill towerThe drill towerPacking the towerDCC deplaningPower Distribution Module (PDM) onto skis
Moving PDM on skisAssembling the DSHRAssembling the DSHRReel AssemblyReel Assembly Team