IceCube
IceCube Neutrino Observatory

Rotating Homepage Images

Aerial View of Seasonal Equipment Site (SES)

Item Information

Category:
IceCube Gallery Rotating Homepage Images

Aerial View of IceCube and South Pole StationAerial View of Seasonal Equipment Site (SES)Cable to Tower Operating System of First StringIvan the Terra BusDrill Descending Down the Hole
Weight Stack in the DarkPutting Firn Drill AwayPutting Firn Drill AwayWrapped and Potted Photomultiplier Tube (PMT) in Gel of Digital Optical ModuleDigital Optical Module Descending Down Hole
Playing Golf at the PoleDigital Optical Modules Ready for DeploymentDigital Optical Module Storage RoomExtreme Cold Weather GearWithin Plane C141 "Starlifter"
At the Digital Optical Module Storage SiteDigital Optical Module DeploymentDeployment at String 21The Departure from the PolePlaying Golf in Surface Cable Trench
Installing IceTop TanksPlaying Golf at the PoleFirst Digital Optical Module descendingIn Plane C-17 to McMurdoAttaching weight stack
Attaching Electrical Cables to Radar DetectorPenguins at McMurdoSwedish Icebreaker Odin Traveling Through McMurdoSwedish Icebreaker OdenPenguins at McMurdo
Closeup of Penguin at McMurdoDigital Optical Module-"Minnesota" descendingResults of a Damaged HoseWorkers Ready for a Game of GolfC-130 Landing at the Pole
Departing DrillersLeaving the Pole with Plane C-130South Pole Air DropIceCube LaboratoryDeployment Team with Last Digital Optical Module on First String
Locating End Frames of Hose ReelDrill Control Center (DCC) DeplaningAnatomy of a Digital Optical ModuleDigital Optical Module on a StringDigital Optical Module Testing in Dark Freezer Lab
Mount ErebusAerial View of McMurdoUnloading DOMs at the Drill TowerPhotomultiplier Tube (PMT) with High Voltage(HV) BaseInstalled Cables Entering the IceCube Laboratory
Digital Optical Modules Ready for DeploymentTower Operation SiteAttaching Calipers to the Enhanced Hot Water DrillSkis are Being Shipped Out to the South PoleOutfitting the Mobile Drilling Structures(MDS)
Generator being shipped to South PoleAssembling the Reel to be Shipped to the South PoleWorking on the Enhanced Hot Water DrillAssembling the Reel to be Shipped to the South PoleInspecting Fuel Tanks
Hose Carrying Hot Water into TowerAttaching drillTurning on First StringDeployment of the First Digital Optical ModuleLowering the Drill head
Returning of Tower Operating System Hose ReelInsertion of Hose into HoleAttaching the Drill HeadPhotomultiplier Tube (PMT) Mounted in JigHeating Water for Drilling
Filling the Water TankNorth Aerial View of Seasonal Equipment SiteEvent Illustration in Digital Optical Module ArrayLoader Installing IceTop TankInside an IceTop Tank
IceCube Laboratory TowerDigital Optical ModuleMoving Mobile Drilling Structures(MDS)Drill control center (DCC)IceTop Tank
Dark Freezer Lab(DFL) at Physical Sciences Laboratory(PSL)Mounting the Board Stack onto the Photomultiplier Tube (PMT) Collar of Digital Optical ModuleFirn Drill and Main DrillMounting Photomultiplier Tube (PMT) in Jigs of Digital Optical ModuleAttaching Collar to Photomultiplier Tube (PMT) of Digital Optical Module
Pouring RTV Gel into the Bottom Hemisphere of Digital Optical ModulePreparing gel in bottom hemisphere of Digital Optical ModuleC130 FleetTurning on a String Inside B-2 Science LabWorking on Drill Hose
Drillers at Tower Operating SiteMounted Board Stacks of Digital Optical ModulesInspecting SPOTS, the Largest Rooftop Neutrino Detector in the WorldNorwegian Skiiers Reaching the PoleC-130 Plane
Constructing SPOTS II, the Largest Rooftop Neutrino Detector in the WorldOn Top of SPOTS II, the Largest Rooftop Neutrino Detector in the WorldSeals, Oden and Mount TerrorFirn Drill Starting a HoleInstalling Standard Candle Laser
Magnetic Shield of the Bottom Hemisphere of a Digital Optical ModuleMoving Drum of Hose ReelAerial View of Dark SectorSteam Rising on a Windless DaySteam Rising on a Windless Day
Digital Optical Modules Hanging in IceTop TankShipping Mobile Drilling Structures(MDS) to South PoleMoving of IceTop TanksCable Trench in SnowHauling Cable
Cargo Plane Over IceCube CampPhotomultiplier Tube (PMT) Mounting in JigPulling Cable from ReelReel TeamHose and Cable Reels from Tower Operating System
Aligning End Frames on Skis of Hose ReelWelding the Hose Reel of the Enhanced Hot Water DrillMoving the IceCube LaboratoryWorking Drillers on SiteSteam Art
Attaching Penetrator and Top Hemisphere of Digital Optical ModuleAerial View of Tower Operating SystemTower Operating SystemWorking at the Tower Operating SystemInside the Tower
Moving the TowerConstructing the TowerPacking the Drill TowerTrenching Through Snow and Placing Cable on SurfaceDeployment weight stack